Question: Feasibility report 3-4 pages Instructions: Create a Feasibility Report for your employer, ABC Manufacturing. The report will focus on the potential to save water and

Feasibility report

3-4 pages

Instructions: Create a Feasibility Report for your employer, ABC Manufacturing. The report will focus on the potential to save water and water costs, and to leave a smaller water footprint.

Background:

-Water usage is 1000 Gallons per day

-Water bills are currently $1000 a month

-No water recycling system

-Goal: Reduce water waste and water costs

Water Recycling System: $50,000; will cut water bills by 2/3 and leave a smaller water footprint. System is powered by a self-contained battery unit. There are, however, additional costs: an initial maintenance agreement for the system costs $1000 a year, and covers all parts and labor costs for the first two years. After that, any repairs associated with the system would have to be paid out of pocket. For example, average labor for any repair starts at $100 per hour. The main power unit costs about $7,000 to replace, though the average life of the units is 15 years. Battery units last about 5 years, and cost $1,000.

Should have an introduction, Background, Scope, Specific Information about the System, and Conclusion and Recommendation.

Some Ideas to Consider:

-Are the long-term savings significant enough to outweigh the costs?

-What are the tangible costs vs. (potential) intangible expenses?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!