Question: Fig. 1 . A Fig. 2 EX . Fig. 3 E . Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe,

Fig. 1 . A Fig. 2 EX . Fig. 3 E . Tailwind, Inc.,Fig. 1 . A Fig. 2 EX . Fig. 3 E . Tailwind, Inc.,Fig. 1 . A Fig. 2 EX . Fig. 3 E . Tailwind, Inc.,Fig. 1 . A Fig. 2 EX . Fig. 3 E . Tailwind, Inc.,

Fig. 1 . A Fig. 2 EX . Fig. 3 E . Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 64. The information for the tasks is as follows: Task Predecessors Performance Time (mins) 1 A 3 A 2 B 4 1 MUAWU I - B C, D A 3 2 F 6 1 G E, H 1 J 3 a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 64. The information for the tasks is as follows: Task Predecessors Performance Time (mins) 1 A A B MOOW LUI W-NW NW B C, D A F 1 G E, H 1 a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in in the figure chosen above- % (enter c) The efficiency of the assembly line with 5 work your response as a percentage rounded to one a Fig. 1 Fig. 2 d) The idle time for the assembly line per cycle = enter your response as a whole number). Fig. 3 Enter your answer in each of the answer boxes. a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positioned weight" to workstations is shown in % (enter c) The efficiency of the assembly line with 5 workstations shown in the figure chosen above- your response as a percentage rounded to one decimal place). d) The idle time for the assembly line per cycle = minute(s) (enter your response as a whole number). Enter your answer in each of the answer boxes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!