Question: figure 1 0 . 4 1 . Column Section and Plan View. Using a waste factor of 5 percent, determine the number of cubic yards

figure 10.41. Column Section and Plan View.
Using a waste factor of 5 percent, determine the number of cubic yards of concrete needed to pour the spread footing and column in Figure 10.41.
Determine the amount of rebar needed for the spread footing and column shown in Figure
10.41. The dowels extend 24 inches into the column. Allow for three inches of cover.
figure 1 0 . 4 1 . Column Section and Plan View.