Question: Figure 3 shows the production system in ABC Sdn Bhd. The company is facing a problem where workers need to lift heavy container containing raw

Figure 3 shows the production system in ABC Sdn

Figure 3 shows the production system in ABC Sdn Bhd. The company is facing a problem where workers need to lift heavy container containing raw soap materials and use stair to pour the ingredients into mixer. This process endangers safety to workers and requires a lot of energy. (a) Suggest a design flow in CE environment to solve the problem. (b) Propose a new mechanism to assist workers to safely pour ingredients into the mixer with the least effort based on the proposed design flow chart in (a). stair container mixer Figure 3: Production system

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!