Question: FINAL PROJECT - BID PROPOSAL As a Vice - President for a Construction Management organization, you have been asked to develop a bid proposal for
FINAL PROJECT BID PROPOSAL
As a VicePresident for a Construction Management organization, you have been asked to develop a bid proposal for the REAL ESTATE OFFICE PROJECT. Review and respond accordingly to the Request For Proposal below:
REQUEST FOR PROPOSAL
Thank you for your expressed interest in the REAL ESTATE OFFICE PROJECT to be built in the State of North Carolina. Your organization is one of the five contractors selected to submit a proposal for negotiated general construction services for the REAL ESTATE OFFICE PROJECT.
A This project consists of a new onestory office building with overall dimensions x Some of the project specifics include concrete footings and foundation walls; slab on grade; wood studframe; trusses;batt insulation; architectural shingles; gypsum drywalls; acoustic ceilings; wood doors; aluminum storefront; mechanical, electrical and plumbing systems.
B Design is complete and permits have to be obtained by the General Contractor. Construction work will start in months and should last months. Please provide a summary construction schedule.
C Your page bidproposal should include the following:
Cover Letter thanking the owner and introducing your organization
Table of Contents
Contractor qualifications for work of similar construction, uses and methods
Experience with any of the owner and designer team members
Organization leadership
Proposed personnel, along with onepage resumes
Two letters of reference from previous clients
Fee proposal
Guaranteed Maximum Price Estimate
Detailed General Conditions Estimate
Summary Schedule
Cost analysis and control plan
Quality control plan
Change management plan
Risk management plan
Conflict management plan
Safety plan
Environmental plan
Value engineering
Insurance, financial and bonding information
Your closing statements should provide a strong justification for why your organization is the most qualified and should be selected for this project.
You will have to be creative and make up some of your responses. For example, the resume of your Supervisor. However, the information that you provide should be realistic and relevant to the REAL ESTATE OFFICE PROJECT.
The FINAL PROJECT must be submitted as a Microsoft Word file. Cost estimate sheets developed in Microsoft Excel must be copied and pasted into the FINAL PROJECT Microsoft Word file. The three levels of submission are as follows:
st draft of FINAL PROJECT Items is due at the end of the th week.
nd draft of FINAL PROJECT is due at the end of the th week.
FINAL PROJECT is due at the end of the th week.
Attach the files to the links provided.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock