Question: find new project conceptual cost estimate Q2. The data provided applies to the schematic of the Coogs office building shown. Use the data provided to

find new project conceptual cost estimate

find new project conceptual cost estimate Q2. The
Q2. The data provided applies to the schematic of the Coogs office building shown. Use the data provided to prepare a conceptual estimate for this project and to answer the following questions: Construction cost of a similar project =$5,250,000 Old project - typical floor area = 75 X 130ft Old project - number of floors 5 Old project - basements/attic = none Old project - had dewatering problems costing = $150,000 Old project - was built in 2016 in NY, NY New project - will be built in 2018 in Austin, TX New project - construction duration = 8 months New project - will be LEED certified costing = $130,000 Design fees = 5% Insurance premium = 896 Bond cost = 2% Administrative costs = $80,000 per year (2 personnel) Land cost = $1,000,000 The owner can secure an 80% loan at a 9% annual interest rate For size correction, m = 0.8 Year Cost Index New Project Schematic Last Year 155 2 Years Ago 150 4 Floor 3 Years Ago 145 4 Years Ago 130 3" Floor 5 Years Ago 110 6 Years Ago 100 20d Floor CITY COST INDEX 1" Floor Boston 1460 Austin 1278 Unfinished Basement (Underground Garage) Portland 1312 New York 1540 64 x 108 ft

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!