Question: First question answer with maximize or minimize 3x+2y answer with 2x + 1y answer with > or > 200- The Attaran Corporation manufactures two electrical
First question answer with maximize or minimize
3x+2y answer with
2x + 1y answer with > or >
200- The Attaran Corporation manufactures two electrical products: portable air conditioners and portable heaters. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each heater must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 140 hours of drilling time may be used. Each conditioner sold yields a profit of $25. Each heater assembled may be sold for a $14 profit. The aim of the objective function for Attaran Corporation should be to the objective value 180- 120 80- Decision variables: X = number of air conditioners to be produced Y = number of heaters to be produced Objective function: Zx+Y 40 Subject to 3x + 24 240 (C) 60 80 100 120 120 160 180 200 2X + 1Y 140 (C) XY 20 Use Excel to solve the model. The optimum solution is: X = (round your response lo Iwo decimal places). Y = (round your response to two decimal places). Optimal solution value Z = (round your response two decimal places)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock