Question: First, you can make sure your model is working correctly before you set up Solver to run. Second, assign - ing the plane fleet manually
First, you can make sure your model is working correctly before you set up Solver to run. Second, assigning the plane fleet manually will demonstrate which constraints you must meet in solving the problem. For instance, if a passenger or cargo utilization rate is over you have not assigned enough planes to carry all the passengers and cargo to a particular destination. Therefore, one constraint is that the total passenger capacity for the planes assigned to a destination must be greater than or equal to the passenger bookings. Another constraint is that the total cargo capacity for the planes assigned must be greater than the cargo shipments booked. Given the fleet size, you can probably assign the fleet manually and meet all of your constraints. However, will your total operating cost be the least expensive solution? Running the problem manually will provide an initial operating cost to which you can compare your Solver solution later. The Solver optimization tool should give you a better solution than assigning the fleet manually. When attempting to assign the planes manually in the Plane Assignment section the changing cells you must satisfy both the passenger and cargo demands for each destinationin other words, the Total Passenger Capacity values in cells J through J and the Total Cargo Capacity values in cells L through L must be equal to or greater than the Daily Demand values in cells D through D and E through E If you have satisfied the passenger and air freight demands correctly, none of the utilization rates in cells K through K and M through M will exceed In addition, the total planes assigned for each type cells F through I cannot exceed the available number of each plane type cells G to G Once you reach a solution that satisfies the preceding constraints, save your workbook. Name the worksheet Rose Tree Guess and then rightclick the worksheet name tab, click Move or Copy, copy the worksheet, and rename the new copy Rose Tree Solver You will use the new worksheet to complete the next part of the assignment.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
