Question: Flag question: Question 52 Question 521 pts If a project has a cost benefit ratio of less than 1, what would the likely course of
Flag question: Question 52
Question 521 pts
If a project has a cost benefit ratio of less than 1, what would the likely course of action?
Group of answer choices
additional project funding will be required
the project will be constructed
The project will not be constructed
the calculations need to be checked
Flag question: Question 53
Question 531 pts
Find the average velocity given s= (3t2 + 5) feet aand t changes from 2 to 2 seconds.
Group of answer choices
25 fps
19 fps
50 fps
15 fps
Flag question: Question 54
Question 541 pts
When an object is moving on a straight line and its coordinate on that line is s at time t (where s is measured in feet and t in seconds) find she velocity at time t=2 when
?=?+2S=t+2
Group of answer choices
5 fps
.25 fps
7 fps
0 fps
Flag question: Question 55
Question 551 pts
In triangle ABC, Side AB= 5; side AC=7 and cos ABC = 3/5. Find the length of side BC.
Group of answer choices
2.1
6.0
5.6
3.1
Flag question: Question 56
Question 561 pts
Write a single logarithm with basea3 loga2 +Loga40 -loga16.
Group of answer choices
log a 17
log a 30
Log a 20
log a 5
Flag question: Question 57
Question 571 pts
Solve
(32?+?2)jQuery22406938381975302403_1620761717492(32x+x2)dx ; The limits on the integral at 0 and 3
Group of answer choices
log 2.5
9
8.5
e3
Flag question: Question 58
Question 581 pts
Prob 62.docxdownload
What is the reaction at Pin A?
Group of answer choices
22.5
35
15
11
Flag question: Question 59
Question 591 pts
Prob 62-1.docxdownload
What is the reaction at Roller D?
Group of answer choices
10
23.5
15
19
Flag question: Question 60
Question 601 pts
Prob. 59.docxdownload
What is the shortest amount of time that this project can be completed?
Group of answer choices
40
35
45
30
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts