Question: Flow from a subdivision is collected in a detention basin. Assume that a short length of 3 - ft diameter reinforced concrete pipe with a

Flow from a subdivision is collected in a detention basin. Assume that a short length of 3-ft diameter reinforced concrete pipe with a square edge inlet (loss coefficient CD=0.5) is used to drain the basin, the outlet of the pipe is unsubmerged, and the inlet head is 10ft above the invert of the inlet end. The discharge (cfs) through the pipe is most nearly:
a.18
b.85
c.150
d.330
Flow from a subdivision is collected in a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!