Question: For 126 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took
For 126 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 6 bottles. The average across all 756 bottles (126 days, 6 bottles per day) was 57 degrees Fahrenheit. The standard deviation across all bottles was .5 degree. When constructing an X-Bar chart, what would be the upper control limit? (Round to 4 decimals)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts