Question: For a bridge construction project, the recommended FM for sand is 2 . 6 . From a market, two sand samples ( sand - 1
For a bridge construction project, the recommended FM for sand is From a market, two sand
samples sand and sand were collected and were sent to a nearby Concrete Laboratory for
sieve analysis. The sieve analysis data are given below:
a Calculate FM of the sand samples
b Draw the grading curve of the sand samples. submit both graph paper plot and excel
plot
c In what proportions, the sand samples are to be mixed to get the recommended FM
d Comment on the samples based on the sieve analysis data and grading curves