Question: for a NEC4 contact. After Completion, it becomes apparent that a lift installed by the Contractor has a maximum load capacity of 8 people, but
for a NEC4 contact. After Completion, it becomes apparent that a lift installed by the Contractor has a maximum load capacity of 8 people, but the Scope required a lift with a maximum load capacity of 10 people. e. How should this be dealt with? What happens if this is not resolved by the Contractor? Assuming there is no retention, how would this issue be dealt with financially?