Question: For future city development, the local authorities in Kuala Langat have decided to shut down the traffic flowing in from the south of intersection C

For future city development, the local

For future city development, the local authorities in Kuala Langat have decided to shut down the traffic flowing in from the south of intersection C as shown in FIGURE Q1c. They also have decided to minimize the traffic flow rates Xi and xz due to the on-going constructions along the roads. To cater for this, the local authorities have come up with 3 plans. Plan 1, Plan 2 and Plan 3 have been proposed to regulate the traffic flow rates B1, B2 and C2 respectively. All plans need to ensure that the vehicles entering the network should always be equal to the number of vehicles leaving the network. As a consultant for the local authorities, you are required to analyze and suggest which plan will ensure that the traffic flow rates xi and Xz are minimized. Justify your answer. A1 B1 X1 !B A2 B2 C2 D2 X3 D1 FIGURE Q1C [20 marks]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!