Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

For the following problem determine: 1. Total usage per piece 2. Pieces per bar 3. Area of the bar stock 4. Volume of a

For the following problem determine: 1. Total usage per piece 2. Pieces per bar 3. Area of the bar stock 4. Volume of a good piece 5. Weight of a good piece 6. Cost of a good piece 7. Cost of # of good pieces in a bar 8. Cost of a bar 9. Cost of waste 10. Yield A round shaft 6.5 in. OD has a specified length of 31.675 in. The facing dimension necessary for a smooth end finish is 1/16 in. The width of the lathe cutoff tool is 3/16 in. The length of the raw bar stock is 12 ft. The lathe collet requires a minimum of 4 in. for gripping the last part. The material costs $0.95/lb and has a density of .291b/in. Use excel and put the formulas in the cells.

Step by Step Solution

3.42 Rating (133 Votes )

There are 3 Steps involved in it

Step: 1

1 Total usage per piece The length of the raw bar stock is 12 ft which is equal to 144 inches The lathe collets require a minimum of 4 inches for grip... blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Statistics For Engineers And Scientists

Authors: William Navidi

3rd Edition

73376345, 978-0077417581, 77417585, 73376337, 978-0073376332

More Books

Students also viewed these Mathematics questions