Question: For the network shown below and the given time estimates, what is the estimated standard deviation of the expected time for the critical path? C

For the network shown below and the given time
For the network shown below and the given time estimates, what is the estimated standard deviation of the expected time for the critical path? C Start End B Variance m Time estimates Expected Activity Optimistic Most Likely Pessimistic Time (ET) a b A 31 40 49 B 44 56 50 48 72 60 22 31 D 34 2.83 days 25 days dows