Question: For the second part that was cut off it reads: Suppose the Speedy boat requires 2,900 machine hours, 108 batches, 360 inspections. Using the activity
M4-9 Assigning Costs Using Activity Rates [LO 4-4] Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. Activity Cost Pools Machining Setup Quality control Estimated Total Cost $ 323,000 75,000 104,000 Estimated Cost Driver 13,000 machine hours 360 batches 770 inspections Suppose the Speedy boat requires 2,900 machine hours, 108 batches, and 360 inspections. Using the activity rates, det calculations to 2 decimal places and your final answers to the nearest dollar amount.) Cost Pool Allocated Overhead Machining Setup Costs Quality Control Total Overhead $ 0
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
