Question: For this building, select the most appropriate gravity system, lateral system, and foundation system. You are designing a new 3 0 - story office building
For this building, select the most appropriate gravity system, lateral system, and foundation system.
You are designing a new story office building in New York City. The owner has approved your conceptual design of a tall rectangular box above a large, open lobby on the ground floor. The geotechnical report shows that the soil on site has a very low less than kft bearing capacity. The geotechnical report does not recommend improving the existing soil as a viable strategy for this project due to site restrictions and time constraints. Instead, the report emphasizes that they encountered bedrock between feet below grade. The owner would like to design the building for hurricane level wind speeds. They would also like to fasttrack the schedule to minimize interruption on campus. The start date for construction will be in December.
The most appropriate gravity system is:
a steel framing
b castinplace concrete pan joists
c castinplace concrete flat plate
d precast concrete framing
The most appropriate lateral system is:
a moment frames
b shear walls
c brace frames
The most appropriate foundation system is:
a drilled bellbottom concrete piers
b mat slab
c spread and strip footings
d driven piles
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock