Question: for three alternatives. They are general - purpose equipment ( GPE ) , flexible manufacturing system ( FMS ) , and expensive, but efficient, dedicated

for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system (FMS), and expensive, but efficient, dedicated machine (DM). The cost data follow:
\table[[,\table[[General-Purpose],[Equipment (GPE)]],\table[[Flexible Manufacturing],[System (FMS)]],\table[[Dedicated],[Machine (DM)]]],[Annual contracted units,200,000,200,000,200,000],[Annual fixed cost,$125,000,$225,000,$525,000Borges Machine Shop, Inc., has a1-year contract for the production of 200 comma 000 gear housings for a new off-road vehicle. Owner Luis Borges hopes the contract will be extended and the volume increased next year. Borges has developed costs for three alternatives. They are general-purpose equipment(GPE), flexible manufacturing system(FMS), and expensive, but efficient, dedicated machine(DM). The cost data follow:
General-Purpose Equipment(GPE)
Flexible Manufacturing System(FMS)
Dedicated Machine(DM)
Annual contracted units
200 comma 000
200 comma 000
200 comma 000
Annual fixed cost
$ 125 comma 000
$ 225 comma 000
$ 525 comma 000
Per unit variable cost
$ 18.00
$ 14.00
$ 13.00
If the contract for the second and third years is pending, for demand below 25 comma 000units, option
is the best alternative for Luis.
Part 2
For demand above 300 comma 000units, option
FMS
GPE
DM
is the best alternative for Luis.
 for three alternatives. They are general-purpose equipment (GPE), flexible manufacturing system

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!