Question: fRequired [round to 2 decimal places}: Using the high low method, calculate the fixed cost component of overhead and the variable rate per kWh. Estimate

 \fRequired [round to 2 decimal places}: Using the high low method,calculate the fixed cost component of overhead and the variable rate per

\fRequired [round to 2 decimal places}: Using the high low method, calculate the fixed cost component of overhead and the variable rate per kWh. Estimate the expected cost for overhead in September assuming that 13,100 kwh's of power are used in the month. 3. Give one smic exomp."_e of a cost that might be included in the variable cost 1you calculated above