Question: From a production analysis for using scrapers to move earth on a project, the following has been determined: The cost to operate a scraper is
From a production analysis for using scrapers to move earth on a
project, the following has been determined:
The cost to operate a scraper is $ per hour and to operate the push
tractor is $ per hour. To achieve the rolling resistance RR it
will be necessary to add a grader to the equipment spread. A grader
costs $ per hour. Calculate the cost to move a bcy of material for
all of the conditions.
a For the RR condition, is it better to use five or six scrapers?
b For the RR condition, is it better to use four or five scrapers?
c Is it economical to invest in the grader and improve production?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
