Question: From given Fence plan and its section below, fill up given table below of Abstract Estimation for a (Load bearin type structure) by Centre

From given Fence plan and its section below, fill up given table

From given Fence plan and its section below, fill up given table below of Abstract Estimation for a (Load bearin type structure) by Centre Line Method Notes: - .4m 1m There is not SKIRITING applied to the Wall Density of Sand 1460kg/m Density of Aggregate 2900kg/m Redraw the Table below, the results must be added in the Table. . whi Lintels cross-section over a Door (h-0.25 x b-0.4) m Excessive length @ each side end of a lintel = 0.20m Door dimension D (2.15x1.1) m. Frame thickness of the Door- 0.06m 0.4m- Series 1 2 3 4 5 6 -6m- Plan of Wall CS Scanned with CamScanner Item 146 131 Earth Work Excavation for Foundation Concrete Casting Foundation 1:1.5:3 Solid Concrete Block Wall Filling up to NGL (Side Filling) Concrete Block Wall for Super structure DPC 1:1.3:2 3m gevloch Unit Quantity m n3 m m m m m 3.1m O Cement Plastering, Mortar (1:1.4) 0.6m NGL 0.0m -0.75m 400 600 30 Marks Cement Plastering, Mortar (1:1.4) Concrete Block 20x20x40, Mortar (1:1.25) DPC 1:1.3:2 -Tiles and Mortar -CC 1:24 @10cm -750- Section A-A -Solid Concrete Block 15 Cement Mortar (1:1.15) Concrete Casting 1:1.5:3 Material Cement In Kg Sand in Kg | Aggregate in Kg Block in Nos. C

Step by Step Solution

3.61 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Total length of wall 34m 602m 3 1739m 1 Becavations 34 6235 68334 25369 G... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!