Question: From the carded graphics replacement case study Unfortunately it doesn't allow me to upload financials 5. Perform a net present value analysis of the sheeter

From the carded graphics replacement case study Unfortunately it doesn't allow me to upload financials

5. Perform a net present value analysis of the sheeter replacement decision. While it is possible to perform such an analysis looking at the changes in all cost items, for this analysis, please calculate (1) the present value of future costs assuming the old sheeter is retained and (2) the present value of future costs assuming the old sheeter is replaced. The net present value of the replacement decision will be the difference between these two values. 6 Conduct a sensitivity analysis of the decision. |Your sensitivity analysis will need to show how changes in key inputs affect the NPV of this decision. The inputs included in your analysis should include the most important inputs and the inputs that are most likely to change during the project's lifespan. Your discussion should center on the change level in these key inputs that make the project acceptable or not acceptable I do expect a chart which graphs the slopes of the sensitivity analysis. Watch the sensitivity analysis video from week 5 as a guide on making the graph ( you will need five levels of change, e.g. -25%, -15%, 0%, +15%, +25% to help excel recognize the analysis)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
