Question: From the plan below complete form WQM-006 contributory flow table and 1 wastewater conveyance systems (A) gravity sewer systems of the Treatment Works application. Also
From the plan below complete form WQM-006 contributory flow table and 1 wastewater conveyance systems (A) gravity sewer systems of the Treatment Works application. Also complete Gravity Sewer Spreadsheet both Slope & Velocity tabs. Finally verify the spreadsheet calculation with hand calculation as demonstrated in class of the attached Engineer's Report Main Street Multi-Family Building.