Question: From the table below, draw the load vs . penetration diagram, then determine the CBR value for the subgrade layer. Evaluate whether the obtained CBR

From the table below, draw the load vs. penetration diagram, then determine the CBR value for the subgrade layer. Evaluate whether the obtained CBR value is acceptable, and provide a reason for your conclusion.
\table[[Penetration (in),0,0.05,0.1,0.15,0.2,0.25,0.3,0.4],[Load (Ib),0,150,250,390,435,450,470,520]]