Question: (General Mathematics) Performance Task 1 You are the lead engineer of a three-story commercial building being constructed in your town. The main entrance of the

(General Mathematics)

(General Mathematics) Performance Task 1 You are
Performance Task 1 You are the lead engineer of a three-story commercial building being constructed in your town. The main entrance of the building is 3 meters (m) above the ground. A ramp leading to the main entrance is to be built 7 m away from the base of the building. The owner of the building asked you to submit a written report that contain the following: a. the information about the length of the ramp. b. the angle of that the ramp should make with the ground. c. list of materials needed. d. the design of the ramp which should consider features on functionality, provisions for the people with disabilities and safety. The owner will read and analyze your report, hence it should be detailed, complete, organized and have correct computations

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock