Question: gh 123% ? 37 Example 4.12 Ship Arrivals at a Dock The Canadian government has built a large grain-shipping port at Churchill, Manitoba, on the

gh
123% ? 37 Example 4.12 Ship Arrivals at a Dock The Canadian government has built a large grain-shipping port at Churchill, Manitoba, on the Hudson Bay. Grain grown in southern Manitoba is carried by rail to Churchill during the open-water shipping season. Unfortunately the port is open only 50 days per year during July and August. This leads to some critical crew staffing decisions by management. The port has the capacity to load up to 7 ships simultaneously, provided that each loading bay has an assigned crew. The remote location and short shipping season results in a very high labor cost for each crew assigned, and management would like to minimize the number of crew's. Ships arrive in a random pattern that can be using the Poisson probability model. If a ship arrives and all available loading bays are filled, the ship will be delaved, resulting in a large cost that must be paid to the modeled owner of the ship This penalty was negotiated to encourage ship owners to send their ships to Churchill Results of an initial analysis indicate that each ship requins six hours for loading by a single creu The port can remain open only 50 days per vear, and 500 ship be loaded during this time Each additional crew costs $180,070, and each builders costs $10.000 How many crous stould be scheduled Lecall 88 Links Desktop AddressStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
