Question: give the project scope for the project You are working as a project manager for an excavation and hauling contractor who has contracted soil hauling
give the project scope for the project
You are working as a project manager for an excavation and hauling contractor who has contracted soil hauling of LCY of blasted rock in acres relatively flat area. The work requires excavating, loading, hauling, dumping, and stockpiling of blasted rock to stockpile at an aggregate plant, which is located miles in poorly maintained road. This road from pit area to stockpiling area is miles with an average grade downhill towards the aggregate plant continued with a upslope after that. It is required to strip ft height of overburden earth and gravel topsoil before loading blasted rock can begin. The topsoil will be stockpiled adjacent to blasted rock stockpile. It is recommended to draw a sketch of jobsite and include required information.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
