Question: Given the flexible and reconfigurable manufacturing work cell below with the following key parameters: 2.1. MTBFWorkcell =287 days 2.2. MTTRWorkcell =15 days 2.3. Average normal
Given the flexible and reconfigurable manufacturing work cell below with the following key parameters: 2.1. MTBFWorkcell =287 days 2.2. MTTRWorkcell =15 days 2.3. Average normal speed of machines at 20 m/sec 2.4. Average actual speed of machines derated by 20%2.5. Typical OEE (62.5%).Determine the following key markers/variable and interpret its implications. 3.1. TEEP of the manufacturing cell and what does the TEEP figure mean? 3.2. Dependability of the manufacturing cell. What does the value mean? 3.3. The failure rate of the manufacturing cell. 3.4. Availability of the manufacturing cell. 3.5. The repair rate of the manufacturing cell. 3.6. The quality marker of the manufacturing cell. 3.7. Is this a capable manufacturing cell? Data/evidence(s)?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts