Question: Given the following data for the tasks involved in assembling a product, design an assembly line with a cycle time of 15 minutes. The correct

 Given the following data for the tasks involved in assembling a
product, design an assembly line with a cycle time of 15 minutes.
The correct the precedence Diagram is Activity Immediate Predecessor(s) Time (days) A
7 2 A D B E B 5 G EF H D
GH 10

Given the following data for the tasks involved in assembling a product, design an assembly line with a cycle time of 15 minutes. The correct the precedence Diagram is Activity Immediate Predecessor(s) Time (days) A 7 2 A D B E B 5 G EF H D GH 10