Given the following data / information, determine the elevation of the weir crest at the river (8
Fantastic news! We've Found the answer you've been seeking!
Question:
Given the following data / information, determine the elevation of the weir crest at the river (8 marks):
- Ground level at head of scheme = 2000 m amsl;
- Operation head = 0.50 m
- Canal length to head works = 5.0 km
- Slope of the canal = 0.5%
- Head loss across structures = 1.50m
- Head loss at intake = 0.10m