Question: Given the project network and baseline information below, complete the form to develop status reports for periods 1-4. Report the final SV, CV, CPI, and




Given the project network and baseline information below, complete the form to develop status reports for periods 1-4. Report the final SV, CV, CPI, and PCIB. 0 1 2 2 4 4 1 1 1 1 1 2 3 3 2 5 o 3 5 5 5 7 6 o O O 0 0 0 0 3 3 3 2 5 5 1 6 LEGEND 0 3 ID 2 EF 2 6 ES 5 0 0 0 SL SL 0 2 2 2 3 5 LS DUR LE Schedule information WP DUR ES LF SL Baseline budget needs ($000) Total Time period PV 0 1 2 3 4 5 12 4 8 6 1 2 o 3 1 2 3 0 3 0 15 3 7 5 3 2 0 2 0 8 4 4 4 2 2. 5 1 6 3 3 5 2 3 5 0 10 6 4 6 " 3 2 5 0 3 3 3 7 1 5 6 0 5 5 19 11 12 7 5 Total PV by period 11 Cumulative PV by period 11 30 41 53 60 65 (Do not round intermediate calculations. Enter all answers to 2 decimal places. For SPI, CPI, and PCI-B, enter your answers as decimals rather than percentage format (e.g., enter 0.93 instead of 93%).) End of Period 1 Task AC PV CV EV SV Actual % Complete 40 700 1 2 30 6 00 3.00 3 25 Cumulative Totals End of Period 2 Task 1 Actual % Complete 100 EV PV AC 14.00 CV SV 2 75 15.00 3 75 8.00 Cumulative Totals End of Period 3 Task EV PV CY SV 1 Actual % Complete 100 75 100 2 14.00 16.00 10.00 4.00 3 4 45 0.00 0 0.00 0.00 5 3.60 4.00 (040) 0.60 6 40 Cumulative Totals End of Period 4 Task EV Actual % Complete 100 AC PV CV SV 1 14.00 2 100 19 00 3 100 10.00 100 4 5 8.00 2.00 30 6 80 720 0.00 900 0 00 (180) 0.00 7 0 Cumulative Totals Performance Indexes Summary Period EV SPI PV CPI PCI-B AC 1 2 3 VACE EACE
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
