Question: Given the table below: If the indirect cost savings is $1,400 per day: a) Provide the steps and process to crash this project b) What

 Given the table below: If the indirect cost savings is $1,400

Given the table below: If the indirect cost savings is $1,400 per day: a) Provide the steps and process to crash this project b) What is the maximum time that this project can be crashed and what is the new duration? What is the optimal time that this project can be crashed and what would be the new duration? What are the extra costs for each? c) Provide the final network diagram (using the maximum crash time)