Question: got everything else right cant get C. Based on a careful work study in the Hofstetter Corp., the results shown in the following table have

got everything else right cant get C. got everything else right cant get C. Based on a careful work

Based on a careful work study in the Hofstetter Corp., the results shown in the following table have been observed: * Photocopying machine broken; included as delay in the allowance factor N Power outage; included as delay in the allowance factor The allowance factor for this type of work is given to be 18%. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) a) The normal time for the "prepare daily reports" operation = 44.88 minutes (round your response to fwo decimal places The normal time for the "photocopy results" operation = minutes (round your response to two decimal places) The normal time for the "label and package reports" operation =4.18 minutes (round your response to two decimal places The normal time for the "distribute reports" operation =142 minutes (round your response to fwo decima( places). The normal time for the overall process =7706 minutes (cound your response to two decimal places): b) The standard time for this process =93.98 minutes (round your response fo fro deamal places) c) The number of observations that are required for a 99% confidence level within 5% accuracy = rownd yourvesponse to the mmediate higher whole number)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!