Question: Group Project: Implementing Predictive Maintenance in a Production Line 5 . Detailed System Specifications: a . System Architecture: Explanation: Describe the overall architecture of the

Group Project: Implementing Predictive Maintenance in a Production Line5. Detailed System Specifications:
a. System Architecture:
Explanation:
Describe the overall architecture of the predictive maintenance system, including:
Data Acquisition Layer: Define the sensors and data collection methods used to gather data from the target equipment.
Data Preprocessing Layer: Explain how the collected data will be cleaned, filtered, and processed for model training and analysis.
Model Development Layer: Specify the chosen predictive model algorithm (e.g., machine learning, statistical) and its training process.
Monitoring and Analysis Layer: Outline how the system will monitor real-time data, detect anomalies, and generate predictions.
Alert and Notification Layer: Define the communication channels and protocols used to alert maintenance personnel about predicted failures.
Integration Layer: Describe any integrations with existing maintenance systems or dashboards.
b. System Block Diagram:
Provide a block diagram that illustrates the system architecture. This need to demonstrate how information and data move across the various parts of the system

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!