Question: Hello! Can somebody help me answer these questions, please? Thank you so much! The analyst in XYZ Company wishes to assign a number of similar

Hello! Can somebody help me answer these questions, please? Thank you so much!

Hello! Can somebody help me answer these

The analyst in XYZ Company wishes to assign a number of similar facilities to an operator, based on minimizing the cost per unit of output. A detailed study of the facilities reveals the following Loading machine standard time = 0.5 minute Unloading machine standard time = 0.5 minutes Power feed time = 2.00 minutes Walk time between machines = 0.25 minutes Assume that the operator rate is $15 per hour and the machine rate is $20 per hour. Answer for the following: (Enter numeric values only) a. What is the ideal number of machines that can be assigned to an operator? (Answer in 1 decimal value) b. What is the maximum number of machines that can be assigned to an operator without creating machine idle time during the repeating cycle? c. What is the cost per unit produced of assigning machines without creating operator idle time? (use 3 decimal values) d. What is the cost per unit produced of assigning machines without creating machine idle time? (use 3 decimal values) e. What assignment minimizes the cost per unit produced? f. What is the minimum number of machines that can be assigned to an operator without creating operator idle time? g. If 20 machines are to be allocated, how many operators are required

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!