Question: hello tutors please post the complete answer boz i have already posted twice before they sent me the answer but i can't see the complete

 hello tutors please post the complete answer boz i have already
posted twice before they sent me the answer but i can't see
the complete answer. Basic 50.000 Activities Engineering (Engineering hours) Quality control (Inspection
hello tutors please post the complete answer boz i have already posted twice before they sent me the answer but i can't see the complete answer.
hours) Machinery (Machine hours) Materials handling (DM costs) Total Sales units Total

Basic 50.000 Activities Engineering (Engineering hours) Quality control (Inspection hours) Machinery (Machine hours) Materials handling (DM costs) Total Sales units Total overhead $ 840,000 951,000 544,000 525.000 $2,860,000 Premium Advanced 5.000 20.000 Activity level 900 hrs 375 hrs 5,000 hrs 10,000 hrs 640 hrs 2,100 hrs $112,500 $300,000 225 hrs 15,000 hrs 2,700 hrs $375,000 Note: Material handling overheads vary with the direct materials costs. 01. (a) Using the activity-based costing system, calculate the cost driver rates for each activity AND product cost per unit for the three product models (13 marks) HEBA XX2- EE 66 (b) Calculate the gross profit per unit for the three product models and advise which model is most profitable under each of the following costing systems: (1) traditional costing (11) activity-based costing (7 marks) 11:39 l 4G Answer 1 of 1 Done Answer: Note 1 Calculation of Production Cost Particulars Premium Sales Us yo Kale Price Total Sales Direct Material Cost (Cost Prix 112300 Therect Lahur Cosi Manufacturing Over Total Production Costa 2156250 Calculation of Manufacturing Overheads and Labour Hours Required Particulars Prim Ada Lines po Zabear Cost Perhe 30 Labour Cost Port 115 hur Heartatuit 25 6 Number Or Hours Roquial 2200 Manufacturing Overhead Cost Porn Manufacturing Overhead Color Labour US Manufacturing Overhead Cou 1670 al Calculation of Activity Driver Rate Particulars Or Overheads Total Lapinning 40000 Qusly Control Machinery 4000 540 Material Handling $25000 Total Costs 360000 10 b) Calculation of Total Cost Under Traditional Costing Method Note Under Traditional Costing Method Overheads Allocated Based on Direct Labour Hours Calculatina of Tetail Cent Linder Traditinal Cenling Methe Particulars Total Product COM Total head Total Costs Sales Profit under Traditional Cesting Method Overhead Allocation = Total Overhead cost Labour hours Required/Total Labour Hours or overheads allocated in the ratio of 3750-12000 20000 ) Calculation of Total Cost Under ABC Casting Method Particulars Tool Product Cat Engineering ulty Control Michinery Material Handling Total Costs Sales profit der AC For Premium Traditional cost is better For Advanced Traditional Cost is better For Basic ABC Costing is Better "Please Give Good Rating Thank You

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!