Question: Help and show work / excel for all problems 1 Intersection LOS and Design ( 5 0 points ) As part of this problem, you

Help and show work/excel for all problems
1 Intersection LOS and Design (50 points)
As part of this problem, you are asked to determine the overall intersection LOS score for a fictional intersection shown below Concidar the diacram of intareantion and turnine mnvamante
Following merimation is pioviueu:
Speed limit on all streets is 30 mph
Lane width is 11 ft on N. Eolm St and 13 ft on Pigah Church Rd.
No heavy vehicles on N. Eolm St; 10% of straight through volume on Pigah Church Rd consists of heavy vehicles
No buses on either street
N. Eolm St. is level, but Pigah Church Road has a 6% grade (uphill in the eastbound direction)
PIEV time is 1 seconds
For the northbound and southbound direction, there are no heavy vehicles so the design vehicle is 12 ft long and has a deceleration rate of 20fts2
For the eastbound and westbound directions, the design vehicle is 25 ft long and has a deceleration rate of 10fts2
1
Answer the following questions and clearly report ALL values with the units:
a)(8 points) Calculate the clearance time for each approach (eastbound, westbound, northbound, and southbound), clearly indicating the value of each term used for the calculations.
b)(12 points) For each of the two-lane groups (left-turn lane group and through-right turn lane group) for each approach (that is, a total of 8 lane groups), compute:
a. Lane width correction factor
b. Heavy-vehicle correction factor
c. Grade factor
d. Left turn factor.
e. Right-turn factor
f. Corrected Saturation flow rate.
c) Design a four-phase signal using the phasing pattern below by calculating the following:
a.(4 points) Critical Z ratio for all four phases using the Z-ratios for the involved lane groups
b.(4 points) Optimal green time for all four phases
c.(3 points) Cycle length
d.(2 points) Effective green time
d) Calculate the delay for:
a.(8 points) each lane group,
b.(4 points) each approach, and
c.(3 points) the intersection as a whole.
e)(2 points) Compute the overall intersection level of service.
Help and show work / excel for all problems 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!