Question: help Table 2 lists the data for the continuous gas lift installed in a production well to revive its oil production. The well was completed

help Table 2 lists the data for the continuous gas lift installed in a production well to revive its oil production. The well was completed with 3.5-in tubing string and a mid-perforation depth of 9000 ft . The production operation of the well was halted due to water accumulation in the bottom hole. Based on the data in Table 2, design the unloading valve/s depth, top valve depth, the operating valve depth, and the required gas injection volume if balanced valves are to be used with 25 psig/valve pressure drop and the kill fluid is unloaded to the pit.
Table 2: Data available for gas lift valve placement
help Table 2 lists the data for the continuous

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!