Question: Here is a work breakdown structure for a patio project. a. What is the duration of the project? b. Which activities are on the critical

Here is a work breakdown structure for a patio project.

a. What is the duration of the project?

b. Which activities are on the critical path?

c. Compute the early and late activity times and slack times.Here is a work breakdown structure for a patioHere is a work breakdown structure for a patio

ID Time Predecessor None A 7 B A 5 n 4 C 10 Description Present list of architects Decide architect Design and rendering Get permit Waste removal Soil tilling Section terrrace D 8 E 3 F 1 G 2 H Plant grass 1 1 J A,B A,B A,B,C,D A,B,C,D,E A,B,C,D,E A,B,C,D,E,F A,B,C,D,E,G A,B,C,D,E,G, A,B,C,D,E,G, A,B,C,D,E,G,1 A,B,C,D,E,G,1,J,K A,B,C,D,E,G,1,J,K,M A,B,C,D,E,G,1,J,K,MN A,B,C,D,E,G,1,J,K,MN A,B,C,D,E,F,G,H,1,J,K,L,M,N,O,P 2 K 1 L N 2 pour concrete Build fire pit Utility systems Fencing Flooring Storage Lights Chair Deliver patio M 5 N 3 Pw 0 1 P 1 Q 1 Soiltilling H Plant grass Design and rendering Present list of architects Decide architect Waste remova M Flooring Get permit D G Section terrrace O Lights P Chair Build fire pit Utility systems 1 pour concrete 913 N Storage Fencing Deliver patio

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!