Question: Hi, guys, I need help on this problem quick, please please be right this problem is stumping me and I CANT AFFORD to get anything
Hi, guys, I need help on this problem quick, please please be right this problem is stumping me and I CANT AFFORD to get anything wrong this is a big part of my grade! I promise to upvote and like!! Please be right!

Jcckson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 70 parts. A part requires 4 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 6 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
