Question: Hi , i have checked this question in the tool before and i have been told that the right answer is B which is You
Hi
i have checked this question in the tool before and i have been told that the right answer is B which is You should measure a minimum of twice a cycle however i have been marked as incorrect in the my academy study appreciate if an expert can check this for me please and let me know what is the correct answer?
Q: According to the BOK, which one of the following is a good rule of thumb for a Control Chart?
Select one:
A It needs at least plots.
B You should measure a minimum of twice a cycle
C Long term cycles can be effectively ignored as they do not add to the total variation
D All special cause variation must be removed before a Control Chart can be used in the DMAIC process
E UCLs should be set in consultation with the VOC
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
