Question: Hi i need help https://www.youtube.com/watch?v=z7b3SYQuqJM https://www.youtube.com/watch?v=Hwu438QSb_g A project manager surveyed his earned value table at the conclusion of month 24. The results are shown in
Hi i need help
https://www.youtube.com/watch?v=z7b3SYQuqJM
https://www.youtube.com/watch?v=Hwu438QSb_g
A project manager surveyed his earned value table at the conclusion of month 24.
The results are shown in the table below. ($ values shown)
Show your work by expanding or adding the necessary rows and columns and then add a small table at the end for these items:
- Is the project on schedule / ahead of schedule / behind schedule?What is showing you this?