Question: Hi there, Please assist with attached tutorial relating to statistics. Regards QUESTION 1 Determine an improved transportation cost solution for these three (3) You are
Hi there,
Please assist with attached tutorial relating to statistics.
Regards

QUESTION 1 Determine an improved transportation cost solution for these three (3) You are given the following data about the tasks, network, and crash times/ [30] bakeries using the u-v method. costs for a particular project. QUESTION 2 [30] crash The following costs highlighted in the table below has been the activities in a project: 8 10 1200 IMMEDIATE COST (R) D 13 2890 PREDECESSORS 838 8 AK B Develop a cost sch edule based on earliest start times. Develop a cost schedule based on latest start times. (8 Calculate the cost of the project at all time dura crash the project any further. ins until you can no longer long(15) 2.2 the Captain of a cricket team has to allot five (5) middle battling positions to five (5) batsmen. The average 1.2 positions are as forus. " runs scored by each batsman at these bakeries x y , and D can be supplied Batsman transporting one tray of bread from each supplier to each shop and ush of an Battling Position of trays of bread required by each shop and the number of trays of bread that can be supplied by each bakery Demand Find the assignment of batsmen to positions, which will give the maximum number of runs. powermine the initial basic feasible transportation cost solution for thes (13 three (3) bakeries using the northwest corner rule. b. Based on your result in question 2.2(a), what is the maximum number of runs that can be could be achieved from the five (5) middle batsmen
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts