Holmes Manufacturing is considering a new machine that costs $290,000 and would reduce pretax manufacturing costs...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Holmes Manufacturing is considering a new machine that costs $290,000 and would reduce pretax manufacturing costs by $90,000 annually. The new machine will be fully depreciated at the time of purchase. Management thinks the machine would have a value of $25,000 at the end of its 5-year operating life. Net operating working capital would increase by $28,000 initially, but it would be recovered at the end of the project's 5-year life. Holmes's marginal tax rate is 25%, and a 12% WACC is appropriate for the project. a. Calculate the project's NPV. Negative value, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to the nearest cent. $ Calculate the project's IRR. Do not round intermediate calculations. Round your answer to two decimal places. % Calculate the project's MIRR. Do not round intermediate calculations. Round your answer to two decimal places. % Calculate the project's payback. Do not round intermediate calculations. Round your answer to two decimal places. years b. Assume management is unsure about the $90,000 cost savings-this figure could deviate by as much as plus or minus 20%. What would the NPV be under each of these situations? Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answers to the nearest cent. 20% savings increase: $ 20% savings decrease: $ c. Suppose the CFO wants you to do a scenario analysis with different values for the cost savings, the machine's salvage value, and the net operating working capital (NOWC) requirement. She asks you to use the following probabilities and values in the scenario analysis: Scenario Probability Cost SavingsSalvage Value NOWC Worst case Base case Best case 0.35 0.35 0.30 $72,000 $90,000 $108,000 $20,000 $33,000 $25,000 $30,000 $28,000 $23,000 Calculate the project's expected NPV, its standard deviation, and its coefficient of variation. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer for expected NPV and for standard deviation to the nearest cent and for coefficient of variation to two decimal places. E(NPV): $ NPV: $ CV: Would you recommend that the project be accepted? -Select- + Holmes Manufacturing is considering a new machine that costs $290,000 and would reduce pretax manufacturing costs by $90,000 annually. The new machine will be fully depreciated at the time of purchase. Management thinks the machine would have a value of $25,000 at the end of its 5-year operating life. Net operating working capital would increase by $28,000 initially, but it would be recovered at the end of the project's 5-year life. Holmes's marginal tax rate is 25%, and a 12% WACC is appropriate for the project. a. Calculate the project's NPV. Negative value, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer to the nearest cent. $ Calculate the project's IRR. Do not round intermediate calculations. Round your answer to two decimal places. % Calculate the project's MIRR. Do not round intermediate calculations. Round your answer to two decimal places. % Calculate the project's payback. Do not round intermediate calculations. Round your answer to two decimal places. years b. Assume management is unsure about the $90,000 cost savings-this figure could deviate by as much as plus or minus 20%. What would the NPV be under each of these situations? Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answers to the nearest cent. 20% savings increase: $ 20% savings decrease: $ c. Suppose the CFO wants you to do a scenario analysis with different values for the cost savings, the machine's salvage value, and the net operating working capital (NOWC) requirement. She asks you to use the following probabilities and values in the scenario analysis: Scenario Probability Cost SavingsSalvage Value NOWC Worst case Base case Best case 0.35 0.35 0.30 $72,000 $90,000 $108,000 $20,000 $33,000 $25,000 $30,000 $28,000 $23,000 Calculate the project's expected NPV, its standard deviation, and its coefficient of variation. Negative values, if any, should be indicated by a minus sign. Do not round intermediate calculations. Round your answer for expected NPV and for standard deviation to the nearest cent and for coefficient of variation to two decimal places. E(NPV): $ NPV: $ CV: Would you recommend that the project be accepted? -Select- +
Expert Answer:
Posted Date:
Students also viewed these finance questions
-
Four wooden beams, each of length 2a, are nailed together at their midpoints to form the support system shown. Assuming that only vertical forces are exerted at the connections, determine the...
-
(Multiple choice) (1) If the gauge pressure is doubled, the absolute pressure will be (a) Halved. (b) Doubled. (c) Unchanged. (d) Squared. (e) Not enough information is given to determine the effect....
-
Gutierrez Company makes two models of portable camping stove, the Sportsman and the Expedition. Basic production information follows: Gutierrez has monthly overhead of $11,180, which is divided into...
-
When the first lease payment is made, what portion of the payment will be considered interest?
-
The Baxter Corporation issued $400,000 of 11% bonds for $385,279.91 on January 1, 2006. The bonds pay interest semiannually on June 30 and December 31, were issued to yield 12%, and are due on...
-
7 of 20 Questions Assignment Score: 0% Resources Ly Give Up? Hint Check Answer Press to exit full screen 4 Question 0% 0 of co Attempts An unfortunate astronaut loses his grip during a spacewalk and...
-
Read the Case 9.1 and address the following in a paper: -Analyze the situation and the needed areas of improvement. -Determine the needed leadership style to help develop a solution. -Outline an...
-
Summarize this article using this very straight forward example: EXAMPLE: Krcmar, M. & Lachlan, K. (2009). Aggressive Outcomes and Videogame Play: The Role of Length of Play and the Mechanisms at...
-
Using the energy/mass balance for the following radiative capture reaction, estimate the energy of the gamma ray () that is emitted. The mass of Co-59 is 58.933200 and Co-60 is 59.933822. 60 59 Co+n...
-
The Windows Virtual Desktop provides a way to access your computer-based resources on multiple computers without having to have them stored on the computer you are sitting at. Explain why this method...
-
Vejar Inc., a local company, produces a small standard component in a process operation. There is a quality control check at the end of processing, and items which fail this check are sold off as...
-
Small Ltd bought a 30% interest in a joint venture, Fry Ltd, for $50 000, on 1 July 2017. The equity of Fry Ltd at the acquisition date was: All the identifiable assets and liabilities of Fry Ltd...
-
Choose the verbs that are conjugated correctly in progressive in Spanish yo estoy barrando, ella esta cantiendo yo estoy barriendo, ella esta cantando, ellos estan saltando nosotros estamos...
-
Select a mass spectrometric technique with the highest mass resolution for identifying an unknown compound being eluted from a liquid chromatography column
-
Describe the recording of transactions that begin and end at a particular point in time and the recording of continuous transactions. LO6
-
Describe the effect on the financial statements when an adjustment is prepared that records (a) unrecorded revenue and (b) unrecorded expense. LO11
-
How is the amount for an interest expense (or interest revenue) adjustment determined? LO10
Study smarter with the SolutionInn App