Question: Homework Assignment In the project network shown in the Figure below, the nodes are denoted by numbers and the activities by letters. The normal and

Homework Assignment In the project network shown in the Figure below, the nodes are denoted by numbers and the activities by letters. The normal and crash durations of the various activities along with the associated costs are shown below in Table. 4 15 E 12 D 10 5 6 F 8 14 16 2 3 B Figure 9.9 Table 9.12 Activity Normal Duration (days) Nornial cost (8) Crash duration (days) Crash cost (S 8 1800 6. 12200 B 16 1500 2200 14 1800 9 2400 D 12 2400 3000 E 15 800 14 2000 F 10 2000 8 -4000 Windows Windows'u et Determine the least cost for 36 days schedule