Question: Homework: Homework 4 - Linear Optimization Question 4, 13.6.51 HW Score: 80.88%, 137.5 of 170 points Part 1 of 2 Points: 75 of 100 Save

 Homework: Homework 4 - Linear Optimization Question 4, 13.6.51 HW Score:

Homework: Homework 4 - Linear Optimization Question 4, 13.6.51 HW Score: 80.88%, 137.5 of 170 points Part 1 of 2 Points: 75 of 100 Save Worley Fluid Supplies produces three types of fluid handling equipment: control valves, metering pumps, and hydraulic cylinders. All three products require assembly and testing before they can be shipped to customers. The accompanying data provide the number of minutes that each type requires in assembly and testing, the profit, and sales estimates. A total of 3,000 minutes of assembly time and 2, 100 minutes of testing time are available next week. Develop and solve a linear optimization model to determine how many pieces of equipment the company should make next week to maximize profit contribution. Click here to view the production and sales estimate data. . . . . . Complete the table below to indicate how many pieces of equipment should be made. Control Valve Metering Pump Hydraulic Cylinder 0 0 0 (Round to the nearest whole number as needed.) X Production and sales estimate data Control Valve Metering Pump Hydraulic Cylinder Assembly time (min) 45 20 30 Testing time (min) 20 15 25 Profit/unit $375 $170 $288 Maximum sales 21 50 45 Minimum sales 5 14 24 Print Done

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!