Question: Homework Problem 2 Activity Predecessor Duration Most Likely Optimistic Pessimistic 5 4 12 A Considering the Project Details; 1 1.5 5 B 1. Construct the

Homework Problem 2 Activity Predecessor Duration
Homework Problem 2 Activity Predecessor Duration Most Likely Optimistic Pessimistic 5 4 12 A Considering the Project Details; 1 1.5 5 B 1. Construct the Project Network Diagram 3 2 4 A D 11 3 4 2. 3 - 4 E 2 1.5 2 2.5 Find the Expected Duration and Standard Deviation and Variance of each Activity Find the Critical path and Expected Project Completion Time F 3. 4.5 3 G 1.5 D 3.5 2.5 7.5 H BE 11 1.5 2 2.5 I 2 3 F.GI 1