Question: how to calculate cost estimate for substructure work . Taking off list Remove top soil Retain excavated material on site Excavate trench foundation Disposal of
how to calculate cost estimate for substructure work
Taking off list
Remove top soil
Retain excavated material on site
Excavate trench foundation
Disposal of exvated material
Concrete the trench
common bricks upto GL
Facing bricks from GL to DPC
Bllock work upto the bottom of the Beam and Block floor
Block wall about Beam and Block floor upto DPC
Forming cavity
Concrete the cavity upto GL
Cavity insulation from GL to DPC
DPC
Backfill to the external side of the trench
Ground Floor Construction
Reduce level dig
Imported filling
Beam and Block floor
DPM
Insulation
Floor boardfinish
Calculation
Projection width
Assumption
Retain top soil on site
Centreline length of Trench
External perimeter of the wall
Ddt
thk of the wall
Centreline length of brick wall
External perimeter of the wall
Ddt
thk of the brick layer
Centreline length of block wall
External perimeter of the wall
Ddt
brickcavity block
Centreline length of external projection
External perimeter of the wall
Add
thk projection
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock