Question: How to find the flow rate using the table and the figure below? the flow rate will then be used to find the utliziation and
How to find the flow rate using the table and the figure below? the flow rate will then be used to find the utliziation and the implied utilization of each resource. Finally, calculate the cycle/takt time for the process.
Nm Processing Time Station (Minutes/unit) Number of Machines Winding Operators per Machine 120 6 2 Assembly 120 6 2 Insulation 60 1 1 Heat treatment 480 2 0 Brazing 60 2 2 Testing 10 1 1 10 1 0 Quality control 1 10 1 Packaging Note: Currently, the last three activities (i.e., testing, quality control, and packaging) are done by only one operator. Order Arrives Order Arrives Heat treatment Winding materials Materials for Core Brazing queue Winding Brazing Assembly Queue Testing and quality check Queue Assembly Testing Insulation Queue Quality Check Insulation Packaging Heat Treatment Queue Orders leave shop

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock